Coming soon · technical projects

From first idea
to a complete handover.

Phase gates with approvals, documents with version history, FAT and SAT on the tablet and a handover file that is complete. For the freelance project manager and for the larger company.

A project in Project2Work: six phases with five gates, what is waiting for you and what blocks the gate Adding a punch list item on a phone: photo first, then type, priority and one sentence
Sound familiar?

How projects often still end

Which revision is valid?

Drawings in emails and folders. Nobody is sure which version was approved.

Suppliers do not deliver

CE declarations, certificates and manuals arrive late or never.

FAT on paper

Test protocols with signatures that are typed up again later.

Handover without a file

Production takes over the plant with open items and half a folder.

What matters

One line from requirement to handover

The requirements in your URS run through the whole project: through the request to suppliers, the tests at FAT and SAT, to the file production uses to take over the plant.

Phase gates

Six phases, five gates, with the deliverables per gate and the approvals of who decides and who co-signs.

Documents with revisions

Always clear which revision is valid, what changed and who approved it.

FAT and SAT on the tablet

OK, not OK or n/a per step. A deviation becomes a punch list item straight away.

Complete handover

A file per system, signed off by the project and the receiving team.

From idea to handover

Six steps, every project

01

Start

Kick-off wizard: goal, team, phases, risks and meetings set up in one go.

02

Requirements and quotes

URS line by line, requests to suppliers and a fair comparison of quotes.

03

Gates

Deliverables done, approvals in, decision on the decision log.

04

Build

Board, actions, minutes, site diary and punch list, with your schedule from MS Project.

05

Test

FAT and SAT on the tablet, signed off by supplier, project and client.

06

Hand over

A file per system, open items visible, equipment on to maintenance.

For the handover

A file that is complete, per system

  • As-built and certificates. Only approved revisions, with CE and inspections included.
  • Signed tests. FAT, SAT and IQ/OQ/PQ go into the file automatically.
  • From requirement to test. For each URS requirement, the test that proves it.
  • Sign-off. The project and the receiving team (production, maintenance, QA) both sign.
All features
The handover in Project2Work: a file per system with a checklist and the requirements already proven
For IT and privacy

Your data stays yours

Part of Hub2Work

One sign-in for Project2Work, Permit2Work and the other modules.

Separated per client

If you work for several clients, you see one client at a time.

Sealed quotes

Bidders cannot see each other and quotes only open after the deadline.

Hosted in the EU

Stored encrypted, with a watermark on downloads of confidential documents.

Want to see it first?

Join the waiting list. Tell us what you miss most in your projects and we will take it into the design.